Case Studies
Our results speak for themselves
Kings cross re-modelling
The Kings Cross Remodelling project was a challenging and complex project, requiring the integration of various engineering disciplines and the use of innovative construction methods. ei's rail engineering integration services played a critical role in the project's success, ensuring that the station's throat area was redesigned and rebuilt to the required standards, while minimizing disruptions and ensuring the safety of passengers and workers.
Arnside Viaduct - Cumbria
Network Rail Awarded May Gurney (Now Kier Rail) the £10.7m contract to reconstruct the Arnside Viaduct and refurbish the substructure. The superstructure replacement involved the replacement of the entire 476m long deck formed from 102 individual decks, totalling 2800 tonnes of steel.
Engineering Integration Ltd (formally Julian Mason Associates Ltd) supported the May Gurney Project Team in bid management, design management, temporary works and engineering management through out the execution of the project.
Reading Green Park Reading Borough Council
ei provided the safety assurance team for the design, build and commissioning phases of this project.
See here for an overview: VIDEO